padding-bottom:6px;

Field survey for proposed bridge replacement on U.S. 160 is set to start Nov. 14

Project location for Bridge replacement. (Click to enlarge)

Sumner Newscow report — A field survey for a proposed bridge replacement on U.S. 160 in Harper County is expected to begin around Monday, Nov. 14.

The survey is for the proposed replacement of the Chikaskia River bridge about a half mile west of the Harper/Sumner County line. The approximate length of the survey is 4,100 feet. The survey is based on the existing alignment.

 This survey, needed for the detailed design of the proposed improvement, is estimated to be completed by Jan. 15, 2023.

Roger Dill, P.S., Project Manager, RIC., will be in charge of this survey for the Kansas Department of Transportation.

Follow us on Facebook.

Follow us on Twitter.



Powered by WordPress